Loading→Leveling→Drying(Pre-heating)→Curing→Cooling and unloading
2.Technical data:
Length :14000mm*2000*1950 Band width: 1200m Max curing temperature: 500℃ Heating up time (rising to 220 degrees C): ≤ 35-50 min Running speed: v=0.2-0.8m/min Drive power: 2.2 kw
Total power : 200kW
Equipment
The electric heating network belt curing furnace mainly consists of Loadind section, Curing furnace; Unloading section; Strong cooling system; Mesh belt transmission mechanism, and electric control system.